
Lancashire
Drylining capacity for the M6 corridor
Commercial and residential drylining and plastering packages for Preston, Lancashire and the towns along the M6 and M61 — delivered by the same crews behind our Cheshire and Manchester work.
Where we work
North of the city, same standards
Lancashire's pipeline is dense with the work we do best: residential developments, commercial fit-outs and leisure schemes that need metal stud, MF ceilings and tape and jointing delivered fast and flat.
The full package travels north with us — drylining and metal stud partitions, SFS infill works, MF and acoustic ceilings, tape and jointing, traditional plastering, fire stopping, second fix joinery, decoration and flooring — as one contract or as standalone trades.
From Tarporley our crews reach Wigan, Bolton, Chorley and Preston inside an hour up the M6 — daily travel rather than lodging costs, which keeps our pricing sharp.
Why Arden Strata
Built to scale with your programme
We price from tender drawings and sequence around your trades, with capacity proven on 22 bespoke projects and more than 100,000 sq m of finishing delivered across the North West.
CSCS-qualified operatives working to RAMS on every project, fully insured, with tidy sites and a programme we hold — whether the job is a single trade or the whole finishing scope.